Abstract
The impact of flywheel torque of refurbished generator units on the limit switching time in Croatian power system is presented in this paper.
Publication
International Conference on Electric Power Engineering, IEEE, PES, PowerTech Budapest 99

Full Professor | Department of Electrical Intallations and Systems

Full Professor | Department of Power Grids and Substations
Full professor at the Faculty of Electrical Engineering, Mechanical Engineering, and Naval Architecture in Split exeperienced in transmission and distribution networks, renewable energy sources (RES), power system planing and economics