The subject of the study is the examination/analysis of the possible effects of the plant for the production of concrete reinforcements of the investor Montaling d.o.o. to the distribution network. The report was prepared based on the request of HEP Distribucija d.o.o. to check the impact of the planned operation on the distribution network. The planned facility will be connected to the distribution network via its own TS 10(20)/0.4 kV and two cable lines 10(20) kV at TS 35/10 kV Ploce (Vranjak), as a temporary solution until construction and connection to the new TS 110/10(20) kV Ploce after it is built.