The study examines and proposes variants for connecting the Velika Glava and Mravinjace wind farms to the 110 kV transmission network, including the techno-economic feasibility of individual variants and a basic calculation of power flows for the purpose of determining the possibility of accepting the maximum power of wind farms by the transmission network.