Report on reactive power compensation efficiency at location Trondheimska 4A

Abstract

As part of the energy inspection of the residential building Trondheimska 4, the correctness of the dimensioning of the capacitor batteries in the business premises, k. no. 4A. Measurements were made with a portable data-logger in a semi-direct connection.

Type
Tonko Garma
Tonko Garma
Full Professor | Department of Electrical Measurements