Alternative grid connection solutions for wind power plant locations owned by EHN d.o.o. in Split-dalmatia couty
In the study, a preliminary analysis of the justification for the construction of a hydropower plant owned by the company EHN d.o.o. …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary feasibility analysis for WPP Mikanovci with grid connection solution and techno-economic/spatial data
In the study, a preliminary analysis of the justification of the construction of the Mikanovci wind farm and the connection to the …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary feasibility analysis for 6 WPP with grid connection solution and techno- economic/spatial data
In the study, a preliminary analysis of the justification of the construction of 6 different wind farms and their connection to the …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary feasibility analysis for WPP Bračevići with grid connection solution and techno-economic/spatial data
In the study, a preliminary analysis of the justification of the construction of the Bračevići VE plant and the connection to the …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary feasibility analysis for WPP Melina with grid connection solution and techno- economic/spatial data
In the study, a preliminary analysis of the justification of the construction of the Melina power plant and the connection to the …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary feasibility analysis for WPP Orlovac 1 with grid connection solution and techno-economic/spatial data
In the study, a preliminary analysis of the justification of the construction of the Orlovac 1 plant and the connection to the electric …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary feasibility analysis for WPP Plić with grid connection solution and techno- economic/spatial data
In the study, a preliminary analysis of the justification of the construction of the Pliš power plant and the connection to the …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary feasibility analysis for WPP Stražbenica with grid connection solution and techno-economic/spatial data
In the study, a preliminary analysis of the justification of the construction of the Stražbenica plant and the connection to the …
Ranko Goić
,
Damir Jakus
,
…
Cite
Thermal power plant connection to Croatian transmission system on location of Dalj and Turski bok
This paper analyzes the connection of the thermal power plant at the Dalj and Turski bok locations to the transmission network of the …
Matislav Majstrovic
,
Ranko Goić
,
Elis Sutlović
,
Eugen Mudnic
Cite
Cite
×