Home
News
Projects
Teaching
Publications
Research Papers
Thesis supervised
Technical Studies
Team
Events
Contact
Light
Dark
Automatic
Electrogeometric Model
Method for estimating backflashover rates on HV transmission lines based on EMTP-ATP and curve of limiting parameters
This paper presents a general method for estimating the backflashover rate (BFOR) on high voltage (HV) transmission lines. The method …
Petar Sarajčev
,
Josip Vasilj
,
Damir Jakus
Cite
DOI
Software package Groza 2.0
The Groza 2.0 software package provides software support for the design of an optimal lightning protection system (external LPS …
Petar Sarajčev
Cite
Models for estimating the number of lightning strikes to transmission lines
The paper describes the problem of determining (estimation) the number of direct lightning strikes in high-voltage power lines, based …
Slaven Tojic
Cite
Analysis of shielding failure flashover rates for HV transmission lines
The paper describes the issue of determining the expected number of shielding failure flashover rates (SFFOR) on HV overhead lines …
Anto Jasprica
Cite
Analysis of shielding failure flashover rates for HV transmission lines
This paper will present an analysis of the expected number of outages of a HV transmission line, which are the result of direct …
Petar Sarajčev
,
Anto Jasprica
Cite
Efficiency assessment of the external lightning protection system
This paper presents an algorithm for the efficiency assessment of the lightning protection system of the buildings and electric power …
Slavko Vujević
,
Petar Sarajčev
,
Dino Lovrić
Cite
Monte Carlo based efficiency assessment of lightning protection system
This paper presents an algorithm for the efficiency assessment of LPS (Lightning Protection System) of buildings and high voltage …
Slavko Vujević
,
Petar Sarajčev
,
Ivan Sarajcev
Cite
Cite
×